Why U.S. Broadcasters Are Moving From Satellite to IP

Blog

For four decades, U.S. television networks have fed their affiliates, cable headends and MVPDs over C-band satellite. That model is ending, and the main reason is spectrum: the FCC is auctioning the airwaves broadcast distribution depends on to wireless carriers.

The FCC is selling off the C-band

In 2020 the FCC cleared the lower 300 MHz of the C-band (3.7–4.0 GHz) for 5G. Auction 107 raised more than $81 billion, and satellite services were packed into the upper 200 MHz.

Now that upper band is going too. Under the FCC’s July 2026 Upper C-band Order, 160 MHz (3.98–4.14 GHz) will go to terrestrial wireless, and satellite services must move out of 4.0–4.16 GHz. Auction 115 is tentatively set to begin April 27, 2027.

The deadlines are close. Satellite operators must file transition plans with the FCC by November 5, 2026, and final clearing falls in 2030 and 2031, according to Lerman Senter. Earth station operators taking a lump-sum reimbursement must tell the FCC whether they will keep satellite, migrate to IP or discontinue service, and that choice is irrevocable.

IP is ready, but the schedule has to move with it

When MASN moved from satellite to managed IP, it cut distribution costs by nearly 60%. PBS has selected a managed IP network for more than 330 member stations.

But moving the signal is only half the job. On IP, the schedule has to drive every downstream system directly: sources, variants, blackouts, ad breaks and as-runs. That is the role of BroadView Nexus.

A working blueprint

BroadView Software, Uplynk, Zixi and Grass Valley have published The IP Convergence Framework for Distribution, a four-layer model covering cloud playout, IP transport, orchestration and streaming, based on a deployment now live in production.